Mashworth Services — Site Survey Form
Mashworth Services
Electrical Site Survey & Scoping Form
Start
Prop
Details
System
Scope
Finish
1
2
3
4
5
6
Step 1
of ?
Basics
Survey Date
*
Engineer Name
Client Name
*
Phone
*
Email
*
House No. / Building Name
*
Street Address
*
Town / City
*
Postcode
*
Occupancy Type
Select...
Owner-occupied
Tenanted
Landlord/Agent (Vacant)
Commercial
Occupied during works?
No (Vacant)
Yes
Partially
Primary Reason for Survey
*
Rewire quote
Consumer unit upgrade
Lighting redesign
EICR
Fault investigation
Extension/Renovation
Other
Next Step →
Select Property Type
*
Flat / Apartment
Terrace (Mid)
Terrace (End) / Semi-Detached
Detached
Bungalow
HMO / Multi-let
Commercial Unit
← Back
Continue →
Floor Level
Ground
Basement
Mid Floor
Top Floor
Access
Stairs only
Lift
Both
Meter Location
Inside flat
Communal cupboard
External
Unknown
CU Location
Inside flat
Communal
Unknown
Landlord Restrictions?
No
Yes
Drilling/Chasing Restrictions?
No
Yes
Details:
Parking/Loading Constraints?
No
Yes
Details:
← Back
Continue →
Approx. Age
Pre-1930
1930 - 1970
1970 - 2000
2000+
Storeys
1
2
3+
Construction Type
Unknown
Solid Wall
Cavity Wall
Timber Frame
Other
Loft Access Available?
No
Yes
Is the loft boarded?
No / Partial
Yes (Fully)
Attached Garage/Outbuilding?
No
Yes
Power required there?
No
Yes
Recent Renovation Areas?
No
Yes
Areas to protect:
← Back
Continue →
Number of Letting Rooms
Fire Alarm System Present?
No
Yes
Unknown
Grade/Type:
Emergency Lighting Present?
No
Yes
Existing EICR Available?
No
Yes
Upload EICR Document / Photo
+ Add Files
Access to all rooms today?
Yes
No
Rooms NOT accessed:
← Back
Continue →
Business Type
Office
Retail
Industrial
Hospitality
Other
Operating Hours
Out-of-hours works?
No
Yes
3-Phase Supply Present?
Unknown
No
Yes
Main Switch Rating:
Photo — Intake / Distribution Board
+ Add Photos
Critical Loads
Servers
Refrigeration
Alarms
Machinery
Compliance Docs Required
EIC
Minor Works
EICR
Test Results Pack
← Back
Continue →
Supply Type
Single-phase
Three-phase
Unknown
Earthing Arrangement
TN-S (Lead)
TN-C-S (PME)
TT (Earth Rod)
Unknown
Main Bonding Present (Gas/Water)?
Yes - Correctly Sized
No
Unsure
Notes:
Required: Bonding Photo(s)
+ Add Photos
Meter Tails Condition
Good
Concerns
Note & Photo:
Tails Photo(s)
+ Add Photos
Signs of Overheating at CU/DB?
No
Yes
Notes:
Evidence Photos
+ Add Photos
← Back
Continue →
Number of Boards
1
2
3+
Enclosure Type
Metal
Plastic
Unknown
Protection Type
RCBOs (Individual)
Split-load Dual RCD
No RCD / Rewirable
Unknown
Priority upgrade required?
No
Yes
SPD Present?
No
Yes
Unknown
AFDD Present?
No
Yes
Unknown
Spare Ways Available?
Yes
No
Unknown
← Back
Continue →
Rewire Type
Full Rewire
Partial Rewire
CU Upgrade Only
Unknown
Bedrooms
Bathrooms
Receptions
Kitchen Re-do?
No
Yes
Special Circuits Needed
Electric Shower
Cooker/Hob
EV Charger
Heat Pump
Hot Tub
Outbuilding
Home Office
Finish Level
Standard White Plastic
Premium / Flat plate
Brushed Metal / Chrome
Client Supplying
Chasing Status
Chasing Allowed
No Chasing
Is surface containment acceptable?
No
Yes (Trunking/Conduit)
← Back
Continue →
Approach
Like-for-like replacement
Total Redesign
Mix of both
Downlights
None
Some rooms
Whole house
Smart Lighting?
No
Maybe
Yes
System preference:
External Lighting?
No
Yes
Areas:
← Back
Continue →
Photo Uploads
Tap a category to add photos — add as many as you like
Intake / Meter
+ Add Photos
Consumer Unit(s)
+ Add Photos
Earthing & Bonding
+ Add Photos
Existing Wiring Condition
+ Add Photos
Cable Routes / Void Access
+ Add Photos
External / Outbuilding
+ Add Photos
Defects / Issues Found
+ Add Photos
General / Additional
+ Add Photos
Access Notes
Client Priorities
Minimal Disruption
Best Finish
Speed
Future-proofing
Budget Cap
Budget Cap (Optional)
Ready for Quote Today?
No - Information Gathering
Yes
Preferred Start:
Decision Makers Present?
Yes
No
← Back
Review →
Review Submission
Summary of captured data
← Back
Submit Survey